Summary

The primary role of the Water Purification Plant will be to ensure that improved water and sanitation are available and accessible to all in the immediate future and as the population grows, to provide a sustainable supply of potable drinking and safe water that is scalable to the growing needs of the region. The overall objective of establishing the Water project is to improve on the livelihoods of the residents of the area by providing quality water for both human and livestock needs

Water and Sanitation

Build Own Operate

200000000

KES

Land

Homabay